Gearing Services

Gearing solutions that maximize performance and improve reliability IPS is your single source solution provider for gearbox services, including in-shop repair, field services, and distribution. Our dedicated technicians rebuild or repair all gearing according to AGMA specifications using modern technology and expert supplier partners. Gearbox Repair Capabilities: Inspection and evaluation report of all internal and […]

Understanding the Withstand and Close-On Rating for Transfer Switches

Numerous short circuit current ratings and references exist for transfer switches that are often confusing and seemingly contradictory. This paper provides some explanation and clarification to help engineers specify the proper equipment to meet local and national regulations. For an electrical system to operate safely, the design should consider a variety of scenarios where things […]

Understanding IBC Wind Load Requirements For Generating Systems

It is important for standby power system enclosures to withstand loads produced by hurricanes and windstorms. These enclosures must be designed to endure the forces of wind loads that are determined by many complex factors. Standards have been created to establish common methodology for design and analysis to minimize losses due to wind events. Building […]

Understanding Seismic Isolation and IBC Certification

It is important for standby power systems to function after natural events including hurricanes and seismic events, specifically earthquakes. Standby power systems located in regions where earthquakes are possible should be certified to function properly after a seismic event. Standby power systems are designed in various ways to achieve seismic certification. A critical element in […]

Paralleling Switchgear: Documenting The Sequence of Operation with Charts Loads

The sequence of operation for a paralleling switchgear project can be complex. Because no two power systems are exactly the same, each should be custom-designed to meet the requirements and challenges associated with the project application. To reduce guesswork and ambiguity during system design and operation, Kohler Power Systems has developed sequence charts that document […]