Home » Services » Engineering Services » Comprehensive Testing
IPS comprehensive testing covers your critical infrastructure. We test equipment on-site, “as received” and “as shipped” after in-shop repair.
Test data and our analytics validate IPS engineering recommendations and guide our solution development. We can schedule testing during planned outages or to start predictive and preventive maintenance.
Our on-site and in-shop diagnostics for electric motors and generators include electrical testing:
We offer non-destructive analysis when appropriate. These tests include:
We provide comprehensive testing for pumps, fans, compressors, and blowers — on-site and in our service centers. These include:
IPS tests to identify and correct factors that cause equipment deterioration, accidents, or failure. This includes non-invasive testing performed without an outage.
Our power management business has a dedicated L-series DILO SF6 gas cart, calibrated to process high-voltage circuit breakers up to 500kV. It performs all key functions for environmentally friendly handling of SF6 gas in commissioning and maintenance of gas-insulated electrical equipment.
Our power distribution testing includes:
IPS contract maintenance programs use testing to improve substation performance and reliability of your electrical system and equipment. Our maintenance testing complies with the latest NETA MTS standard.
Single-source capabilities to solve reliability problems, work within outages, and minimize unplanned downtime.
We move operations away from a reactive approach to equipment failure, reducing emergency costs, unplanned downtime, and lost productivity.
Storage and maintenance to reduce unplanned downtime, with 24/7 response and fast shipment, plus delivery, installation, and alignment.